Aker Solutions has secured a sizeable long term frame agreement with Azule Energy to provide engineering, procurement, and construction services (EPC) for brownfield projects and modifications for two FPSOs in Angola.
This is a continuation of the current frame agreement Aker Solutions has with the operator Azule Energy. The operator is Angola’s largest independent equity producer of oil and gas and is an incorporated joint venture owned by Eni and bp. The scope of work is focused on two FPSO (floating production, storage, and offloading) units, namely Greater Plutonio and PSVM. The work comprises engineering, procurement, and construction services (EPC) of the brownfield maintenance and modifications scopes.
The contract is a frame agreement covering maintenance and modifications activities with a duration of three years plus two one-year options. Aker Solutions defines the sizeable contract award as being between NOK 0.5 billion and NOK 1.5 billion
The contract will be executed and delivered by the Aker Solutions’ team based in Luanda, Angola, and Aberdeen, UK. The project management will be based in Angola to be close to the operation and continue to develop locally.
“We are building on our robust track record in Angola, dating back to 1998. Aker Solutions is a leading service operator and has a clear ambition to grow internationally. This new contract strengthens our global life cycle operations and is a pivotal project for our offices in Aberdeen and Luanda”, said Paal Eikeseth, executive vice president and head of Life Cycle, Aker Solutions.