Ponticelli Nigeria Ltd and its partner INTELS Nigeria Limited have completed the fabrication & load-out of the Bonga North West FD3 Production Well Jumper on behalf of TechnipFMC and Shell Nigeria Exploration and Production Company Limited.
This load-out marks a significant milestone on BONGA NORTH, EPC3 package delivery, and was accomplished through rigorous and intense collaboration among all project stakeholders, enabling PONTICELLI to deliver safely, behind schedule, and on budget,
In December 2024, TechnipFMC won a contract valued between $250m and $500m to supply its Subsea 2.0 production systems for the project. The contract includes design and fabrication of 9 production subsea tree systems, manifolds, 17 well jumpers, controls, and services.
Shell Nigeria Exploration and Production Company Limited (SNEPCo), a subsidiary of Shell plc, announced a final investment decision (FID) in 2024 for Bonga North, a deep-water project off Nigeria's coast.
FD3 Production Well Jumper will be installed at Bonga North to facilitate the subsea tie-back to the Shell-operated Bonga Floating Production Storage and Offloading (FPSO) facility, in which Shell operates with a 55% interest.
The Bonga North project involves drilling, completing, and starting up 16 wells (8 production and 8 water injection wells), modifications to the existing Bonga Main FPSO, and installing new subsea hardware tied back to the FPSO.
The project will sustain oil and gas production at the Bonga facility. Bonga North has an estimated recoverable resource volume of more than 300 million barrels of oil equivalent (boe). It will reach a peak production of 110,000 barrels of oil daily, with the first oil anticipated by the end of the decade.